RECENT
PROJECTS
Glenshire and Dorchester Drive
Widening
2016 / Ongoing
The Town of Truckee plan to reconstruct and widen Glenshire Drive (Truckee River Legacy Trail to Dorchester Drive) and Dorchester Drive (Glenshire Drive to Waterloo Circle). This project also includes a left-turn lane on Glenshire Drive at Dorchester Drive. Project will also include a pedestrian crossing of Glenshire Drive in the vicinity of the Legacy Trail Trailhead.
Sage Land Surveying was retained by the Town of Truckee and Lumos & Assoc. to perform Right of Way Resolution, Base Mapping, Right of Way station staking and Corridor Topographic Mapping for design purposes.
Construction began in 2014 and is ongoing.